"ELITE 1" LLC, Yerevan, Nerqin Charbakh 48

Capacity

28.5 kW

Location

Yerevan, Nerqin Charbakh 48

Solar modules

AE SOLAR 380 W, monocrystalline 75 pcs, Germany

Inverter

SMA Sunny Tripower 25000 TL, Germany

Annual electricity production

42750 kWh

"Tanti" restaurant, Syunik province, Shaki community 20.4 kW
"Tanti" restaurant, Syunik province, Shaki community
20.4 kW
"7 Qar" restaurant complex, Kotayk Province, Garni village 22.77 kW
"7 Qar" restaurant complex, Kotayk Province, Garni village
04 Nov 2018
22.77 kW
"EDMET" LLC, Yerevan, Shengavit administrative district 114 kW
"EDMET" LLC, Yerevan, Shengavit administrative district
114 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW