"GAVA" LLC, Aragatsotn province, Ashtarak

Capacity

28.5 kW

Location

Aragatsotn province, Ashtarak

Solar modules

,AE SOLAR 380 W, monocrystalline 75 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

42380 kWh

School, Syunik province, Agarak 22.44 kW
School, Syunik province, Agarak
27 July 2019
22.44 kW
"Via Sakra" Clinic, Shirak province, Gyumri 5.94 kW
"Via Sakra" Clinic, Shirak province, Gyumri
08 July 2019
5.94 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Kotayk province, v. Ara 5.28 kW
Kotayk province, v. Ara
5.28 kW