"PrintMan" Printing house, Shirak province, Gyumri

Capacity:

11.4 kW

Location:

Marz Shirak, Gyumri

Solar modules:

AE SOLAR 380 W, monocrystalline 30 pcs, Germany

Inverter:

SMA Sunny Tripower 10000 TL, Germany

Annual electricity production։

17100 kWh

Type:

On-grid, three-phase

"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Kotayk province, v. Arinj 6.9 kW
Kotayk province, v. Arinj
14 March 2018
6.9 kW
Shirak marz, Getk secondary school 30 kW
Shirak marz, Getk secondary school
30 kW
"MNB" LLC, Armavir province, Musaler village 226.59 kW
"MNB" LLC, Armavir province, Musaler village
226.59 kW