"Sun Energy" LLC, Armavir Province, Merdzavan village

Capacity:

3000 kW

Location:

Merdzavan, Armavir Province

Solar modules՝

AE SOLAR 450 W, monocrystalline 6820 pcs, Germany

Inverter:

Huawei 100 kW inverter, 30 pcs.

Annual electricity production։

5550 MWh

Description
 

The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. 
In the surrounding area must be installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.

 

Zar secondary school named after J.Sargsyan 75,85 kW
Zar secondary school named after J.Sargsyan
75,85 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
"Tanti" restaurant, Syunik province, Shaki community 20.4 kW
"Tanti" restaurant, Syunik province, Shaki community
20.4 kW
"MNB" LLC, Armavir province, Musaler village 226.59 kW
"MNB" LLC, Armavir province, Musaler village
226.59 kW