Ararat province, Kharberd village

Capacity

5․32 kW

Location

Ararat province, Kharberd village

Solar modules

,AE SOLAR 380 W, monocrystalline 14 pcs, Germany

Inverter

SMA SUNNY BOY, Germany

Annual electricity production

7980 kWh

Kotayk province, Yeghvard 5.44 kW
Kotayk province, Yeghvard
5.44 kW
"HAMOVIK" LLC, Yerevan, Malatia-Sebastia administrative district 52.82 kW
"HAMOVIK" LLC, Yerevan, Malatia-Sebastia administrative district
52.82 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Zar secondary school named after J.Sargsyan 75,85 kW
Zar secondary school named after J.Sargsyan
75,85 kW