Armavir province, Metsamor

Capacity

5.32 kW

Location

Armavir province, Metsamor

Solar modules

,AE SOLAR 380 W, monocrystalline 14 pcs, Germany

Inverter

SMA SUNNY BOY, Germany

Annual electricity production

7980 kWh

Kotayk province, v. Geghashen 2.76 kW
Kotayk province, v. Geghashen
10 Oct 2018
2.76 kW
"ELITE 1" LLC, Yerevan, Nerqin Charbakh 48 28.5kW
"ELITE 1" LLC, Yerevan, Nerqin Charbakh 48
28.5kW
SECONDARY SCHOOL OF SARATAK 30,34 kW
SECONDARY SCHOOL OF SARATAK
30,34 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW