Armavir province, Metsamor

Capacity

5.32 kW

Location

Armavir province, Metsamor

Solar modules

,AE SOLAR 380 W, monocrystalline 14 pcs, Germany

Inverter

SMA SUNNY BOY, Germany

Annual electricity production

7980 kWh

"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Sevaberd secondary School 10.66 kW
Sevaberd secondary School
10.66 kW
"Viar" smithy, Kotayk province, Yeghvard 15.2 kW
"Viar" smithy, Kotayk province, Yeghvard
15.2 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village 800 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village
The installation of 800 kW power plant was made with 14 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
01 July 2020
800 kW