Yerevan, Nork-Marash administrative district

Capacity

23.56 kW

Location

Yerevan, Nork-Marash administrative district

Solar modules

,AE SOLAR 380 W, monocrystalline 62 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

35340 kWh

Georgia, Tbilisi 6․12 kW
Georgia, Tbilisi
6․12 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Kotayk Secondary School After S.Vardanyan 30,75 kW
Kotayk Secondary School After S.Vardanyan
30,75 kW
"Blueberry Gelato" LLC, Kotayk region, Verin Ptghni 23․1 kW
"Blueberry Gelato" LLC, Kotayk region, Verin Ptghni
«‎Բլուբերրի Ջելատո» պաղպաղակի արտադրամասն այսուհետ տարեկան կխնայի 𝟏,𝟕𝟔𝟕,𝟏𝟓𝟎 ՀՀ դրամ՝ շնորհիվ տեղադրված գերմանական բարձրորակ արևային համակարգի։
23․1 kW