Yerevan, Davtashen

Capacity:

12․81kW

Location:

Yerevan, Davtashen

Solar modules:

EURENER 260 W, monocrystalline 36 pcs, Spain, RECOM 345 W, monocrystalline 10 pcs, Germany

Inverter:

KACO Blueplanet 8.6 TL3, KACO Blueplanet 3.0 TL3, Germany

Annual electricity production։

19215 kWh

Type:

On-grid, three-phase

"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Yerevan, Nork-Marash administrative district 23.56 kW
Yerevan, Nork-Marash administrative district
23.56 kW
Kotayk province, v. Arinj 6.9 kW
Kotayk province, v. Arinj
14 March 2018
6.9 kW
Armavir province, Metsamor 5.32 kW
Armavir province, Metsamor
5.32 kW