Yerevan, Davtashen

Capacity:

12․81kW

Location:

Yerevan, Davtashen

Solar modules:

EURENER 260 W, monocrystalline 36 pcs, Spain, RECOM 345 W, monocrystalline 10 pcs, Germany

Inverter:

KACO Blueplanet 8.6 TL3, KACO Blueplanet 3.0 TL3, Germany

Annual electricity production։

19215 kWh

Type:

On-grid, three-phase

"Artsakh" hotel, Yerevan, Shengavit administrative district 42.78 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district
15 January 2019
42.78 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Gyumri Basic School No. 6 25,83 kW
Gyumri Basic School No. 6
25,83 kW
Kotayk province, v. Arinj 6.9 kW
Kotayk province, v. Arinj
14 March 2018
6.9 kW