"Artsakh" hotel, Yerevan, Shengavit administrative district

Capacity:

42.78 kW

Location:

Yerevan, Shengavit a.d.

Solar modules:

AE SOLAR 345 W, monocrystalline 124 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 20000 TL, Germany

Annual electricity production։

64170 kWh

Type:

On-grid, three-phase

Kindergarten No. 4 in the city of Martuni 9,84 kW
Kindergarten No. 4 in the city of Martuni
9,84 kW
Pharmacy, Kotayk province, Zovuni village 15.96 kW
Pharmacy, Kotayk province, Zovuni village
15.96 kW
Lori province, Vanadzor 5.52 kW
Lori province, Vanadzor
18 July 2018
5.52 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW