Capacity

5․85 kW

Location

Yerevan, Haghtanak lane

Solar modules

AE SOLAR 390 W, monocrystalline 15pcs, Germany

Inverter

SMA Sunny Tripower 5․0 Germany

Annual electricity production

8775 kWh

Voskanyan Group 115.5 kW
Voskanyan Group
"Voskanyan Group" LLC, producer of cans, will use the inexhaustible energy of the sun from now on, saving 𝟖,𝟖𝟑𝟓,𝟎𝟎𝟎 AMD
115.5 kW
Martuni N2 basic school after S. Darbinyan 37,72 kW
Martuni N2 basic school after S. Darbinyan
37,72 kW
"GAVA" LLC, Aragatsotn province, Ashtarak 28.5 kW
"GAVA" LLC, Aragatsotn province, Ashtarak
28.5 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW