"MNB" LLC, Armavir province, Musaler village

Capacity

226.59 kW

Location

Armavir province, Musaler village

Solar modules

AE SOLAR 390 W, monocrystalline 581 pcs, Germany

Inverter

SMA SUNNY TRIPOWER Core1 4 pcs, Germany

Annual electricity production

339885 kWh

 

Kotayk province, v. Geghashen 2.76 kW
Kotayk province, v. Geghashen
10 Oct 2018
2.76 kW
Armavir province, Metsamor 5.32 kW
Armavir province, Metsamor
5.32 kW
Buzhakan Secondary school after Gegham Gharibyan 51,25 kW
Buzhakan Secondary school after Gegham Gharibyan
51,25 kW
MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW