Kotayk province, Yeghvard

Capacity

5.44 kW

Location

Kotayk province, Yeghvard

Solar modules

,AE SOLAR 340 W, monocrystalline 16 pcs, Germany

Inverter

SMA SUNNY BOY, Germany

Annual electricity production

8160 kWh

Yerevan, Nork-Marash administrative district 23.56 kW
Yerevan, Nork-Marash administrative district
23.56 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW
Martuni Culture House 15,17 kW
Martuni Culture House
15,17 kW
SECONDARY SCHOOL OF SARATAK 30,34 kW
SECONDARY SCHOOL OF SARATAK
30,34 kW